911BlackEd
Nurburgring
- Joined
- 27 Jun 2011
- Messages
- 461
Having a very frustrating time waiting, and now being told its delayed even longer! Anyone else being told this?
I am told that every 991 (over 150 and counting) is being held in the port of Emden at an inspection area and having the fuel pipe replaced by the factory, at the port! Sounds like a bit of a botch to me and really unhappy! Was meant to be delivered 12th March!!
I am told that every 991 (over 150 and counting) is being held in the port of Emden at an inspection area and having the fuel pipe replaced by the factory, at the port! Sounds like a bit of a botch to me and really unhappy! Was meant to be delivered 12th March!!